Environmental Permit Application for Murfitts Industries Ltd

Public Consultation

15/10/26

Notice is hereby given that in accordance with the Environmental Permitting (England & Wales) Regulations 2016 (schedule 13) an environmental permit to operate a schedule 13 SWIP (small waste incinerator plant) has been granted to Murfitts Industries Ltd, Campbell Road, Stoke, ST4 4EW – the Permit can be viewed by following this link and the Decision document can be viewed here.

An environmental permit controls how the site operates, to make sure it does not cause harm to health or the environment. As a regulated facility, once operating, the site will be subject to regular inspection by Public Protection (the Regulator) to check and secure compliance with the permit conditions. Before the site becomes active, there is a requirement for the Operator to submit a commissioning plan to provide details of how and when the site will be made operational, along with any update of the Environmental Management System arising from commissioning.

ENVIRONMENTAL PERMITTING (ENGLAND AND WALES) REGULATIONS 2016 Regulation 13 and Schedule 5, Paragraph 6

It is a legal requirement for the Council to consult the public on applications for certain types of environmental permit. Notice is hereby given that the following application has been received:

APPLICANT:

Murfitts Industries Ltd

SITE ADDRESS:

Campbell Road, Oakhill, Stoke, Stoke-on-Trent ST4 4EW

PERMIT TYPE:

Schedule 13, SWIP (Small Waste Incineration Plant)

CONSULTATION END DATE:

9 February 2026

SEND WRITTEN COMMENTS TO:

public.protection@stoke.gov.uk

Public Protection, Floor 3 Civic Centre, Glebe Street, Stoke, Stoke-on-Trent, ST4 1HH

 

The application form and associated files can be downloaded from the links below. A paper copy of the application may be viewed at the Civic Centre by prior arrangement, please call 01782 237788 to make an appointment.

Any representations made will be duly considered when determining the application and comments received will be placed on the public register, unless they include a specific request that this is not done.

The following documents have been supplied by a third party to the council, and therefore may not meet accessibility standards.

Document Name

Document Description

Stoke Tyre Pyrolysis Facility Application Form.pdf

Application Form

CRM 0180 001 PE D 001 Site Location Plan.pdf

Site Location plan

CRM 0180 001 PE D 002 Site Layout Plan.pdf

Site Layout Plan

CRM 0180 001 PE D 003 Site Drainage Plan.pdf

Site Drainage Plan

CRM.0180.001.PE.R.003 Non technical Summary

Non Technical Summary

CRM.0180.001.PE.R.005. ERA.pdf

Environmental Risk Assessment

CRM.0180.001.PE.R.006 OTMP.pdf

Operational Techniques and Monitoring Plan

PFD for P&P.pdf

Process Flow Diagram

Heat and Mass Balance.pdf

Heat and Mass Balance