Due to the extreme heat, there may be some delays to waste collections.

Our crews’ welfare is a priority, so they’ll adapt to the heat with regular breaks, hydration and sunscreen. Please leave bins out by 6am. We’ll collect them as soon as we can.

Strategic Housing Land Availability Assessment - Methodology

The Strategic Housing Land Availability Assessment (SHLAA) is one of a number of technical reports that will provide baseline evidence to inform the emerging Local Plan.

  • File type: PDF
  • Size: 1.54 MB
Download